Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 6 results ...
Alaghbari, M W, Kadir, R A and Salim, E A (2007) The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(02), 192–206.
Glass, J and Simmonds, M (2007) “Considerate construction”: case studies of current practice. Engineering, Construction and Architectural Management, 14(02), 131–49.
Jaafar, M, Ramayah, T, Abdul-Aziz, A-R and Saad, B (2007) Technology readiness among managers of Malaysian construction firms. Engineering, Construction and Architectural Management, 14(02), 180–91.
Lê, M A T and Brønn, C (2007) Linking experience and learning: application to multi-project building environments. Engineering, Construction and Architectural Management, 14(02), 150–63.
Sutrisna, M and Barrett, P (2007) Applying rich picture diagrams to model case studies of construction projects. Engineering, Construction and Architectural Management, 14(02), 164–79.
Swan, W and Khalfan, M M A (2007) Mutual objective setting for partnering projects in the public sector. Engineering, Construction and Architectural Management, 14(02), 119–30.